PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued installing rebar at the slab on deck 3rd Floor Facing North-East  (800x600).jpg Core drilled holes for the electrical conduit at Elect. Room 284 Facing West (800x600).jpg Duct hangers at the 1st floor Facing South-East (800x600).jpg Installed conduit at IT-Phone Room 283 Facing South-West (800x600).jpg Installed foam along the columns to protect the stone panels Facing South-West (800x600).jpg Installed formwork for the 3rd floor slab on deck Facing East (800x600).jpg Installed hangers for the electrical conduits at the 2nd Floor Facing West (800x600).jpg Installed overhead conduita at the 1st floor Facing East (800x600).jpg Installed vent piping at the Sprinkler Room Facing East (800x600).jpg
Previous pageNext page Installed foam along the columns to protect the stone panels Facing South-West (800x600)
Installed foam along the columns to protect the stone panels Facing South-West (800x600)